top go
  • main page
  • >
  • PR
  • >
  • Photo News

Photo News

  • +
  • -
  • Performance check over Local Revenue System
  • Date
  • 2024/01/18
  • Hit
  • 70
NIRS Structure Diagnosis Support Team held a final performance check over next generation Local Revenue System of the Ministry of the Interior and Safety (MoIS) before its official opening for two days from January 16th to 17th, 2024.

A final load test was conducted for stable opening, including measuring the maximum performance and optimizing settings over major public service support functions. NIRS is planning to hold committee meetings and manage opening situations to support the smooth launch of the system in the future.


Performance check over Local Revenue System


File 1 : 240118_1.jpg
Next ¡ã
Held a Technical Advisory Committee meeting
Preview ¡å
Network Training of NIRS Daegu